Projects
Electric Heat Tracing

In October 2019, Bright Engineering Ltd. successfully completed the second of three total stages in the design, delivery,
see more
Lukoil Neftochim Burgas
Overhaul of Cylinder middle and low pressure of turbogenerator ст. №4 type ПТ-60-130/13 – 60MW in production TPP of „Lukoil Neftochim Burgas” ADReplacement of Rotor generator of TG-4 with that of TG-5Assembly and delivery of a dosing unitDesigning and manufacturing of Hydrogen Purging UnitsDelivery, Installation, Commissioning and startup of Centrifugal Fan Flue gasesDesign, Delivery and Installation of a Fire Alarm SystemAssembly PV- modulesInstallation&Start Up of Flaregas FlowmeterDesign, Delivery and Installation of Two Gas BlowersTechnical inspection of oil vessels
Contour Global Maritsa East 3 AD
Installation&Start Up of Oxygen Analysers on Units 3 and 4 Supply, installation and start up of O2-meters with sampling points at the flue gas duct after the ESP of units 1-4 spare of the thermal power plant Enel Maritza EastDesign and erection of electrical heat trace system at Chemical Dosing System
AES - TPP Maritza East 1
Verification of 3300 XL Proximity Transducer Systems (Probes and Proximitors) for Radial Vibrations, Differential Expansion, Axial Position and Keyphasor
see more
TPP "Maritsa East”2 EAD
Reconstruction of boiler units № 11 and № 12Diagnostics of high-pressure rotor and reblading first and second stage of turbine K-225 (№6)Dynamic balancing of rotor high-pressure turbine K-225-130 rated speedRepair of high pressure rotor of a turbine K-210-130 St.№5 and balancing at nominal RPMBalancing the rotor medium-pressure turbine K-210-130 of rated speedReplacement blades degrees № 13 № 14 of rotor medium-pressure turbine K-210-130 and mechanical treatment rotor after replacement of bladesVerification and calibration of sensors for mechanical quantities of turbogenerator № 6Research, design, disassembly, installation, lining and commissioning of technical means for measuring (CSI) and vibration analysis of turbine generators (TG) № 7 and № 8Research, design, disassembly, installation, adjustment and commissioning of technical means for measuring (CSI) and vibration analysis of turbine generators (TG) № 5 and № 6
TPP Sofia EAD
Steam Turbine №8А 12MW -General Turbo / TPP Sofia (Instalation of new Turbine)Emergency repair of the flow of the turbine № 8 in TPP SofiaMajor overhaul of turbogenerator № 8 in "TP Sofia"Balancing of the rotor high pressure turbine VPT 30Engineering cascade joining the TG 8 a new anti-pressure turbine TG 8 A TPP "Sofia"Award of the additional service to complete the Bektash "Building an automated management system of thermo-hydraulic regime of district heating area "Sofia East"
Slunchevi Luchi Provadia EAD -Technoimportexport AD
Detailed design, manufacture, delivery, installation, commissioning and start-up of I & C equipment on the territory of factory "Slunchevi luchi” EAD Provadia, Department “Decortication”
see more