Lukoil Neftochim Burgas

Overhaul of Cylinder middle and low pressure of turbogenerator ст. №4 type ПТ-60-130/13 – 60MW in production TPP of „Lukoil Neftochim Burgas” AD

Replacement of Rotor generator of TG-4 with that of TG-5

Assembly and delivery of a dosing unit

Designing and manufacturing of Hydrogen Purging Units

Delivery, Installation, Commissioning and startup of Centrifugal Fan Flue gases

Design, Delivery and Installation of a Fire Alarm System

Assembly PV- modules

Installation&Start Up of Flaregas Flowmeter

Design, Delivery and Installation of Two Gas Blowers

Technical inspection of oil vessels