TPP "Maritsa East”2 EAD

Reconstruction of boiler units № 11 and № 12

Diagnostics of high-pressure rotor and reblading first and second stage of turbine K-225 (№6)

Dynamic balancing of rotor high-pressure turbine K-225-130 rated speed

Repair of high pressure rotor of a turbine K-210-130 St.№5 and balancing at nominal RPM

Balancing the rotor medium-pressure turbine K-210-130 of rated speed

Replacement blades degrees № 13 № 14 of rotor medium-pressure turbine K-210-130 and mechanical treatment rotor after replacement of blades

Verification and calibration of sensors for mechanical quantities of turbogenerator № 6

Research, design, disassembly, installation, lining and commissioning of technical means for measuring (CSI) and vibration analysis of turbine generators (TG) № 7 and № 8

Research, design, disassembly, installation, adjustment and commissioning of technical means for measuring (CSI) and vibration analysis of turbine generators (TG) № 5 and № 6